Office Relocation Checklist: A 6-Month Timeline for Moving Your Business
Reviewed by David Yosef, Founder & CEO
Moving an office is part real estate deal, part construction project and part IT migration. Most moves that go wrong do not fail on moving day. They fail months earlier, when a lease is signed without a fit-out plan, or when construction starts too late to finish before the old lease expires.
This office relocation checklist breaks the move into a six-month timeline. Larger offices, or spaces that need significant construction, should start earlier. Use it as a working document and assign an owner to every line.
Key Takeaways
- Start planning at least six months before your current lease ends, and longer if the new space needs major construction.
- Bring a contractor in before you sign the new lease, so the fit-out budget and schedule are real.
- Permits, long-lead materials and IT cabling are the items most likely to delay a move-in date.
- Check your current lease for restoration obligations so you are not paying to undo old work at the last minute.
- Communicate early and often with employees, clients and suppliers.
Table of Contents
- 6 Months Out: Strategy, Budget and Lease
- 5 Months Out: Space Planning and Design
- 4 Months Out: Permits, Pricing and Contractor
- 3 to 2 Months Out: Construction and IT
- 1 Month Out: Moving Logistics
- Moving Week and Move-In Day
- After the Move: Deficiencies and Closeout
- Frequently Asked Questions
6 Months Out: Strategy, Budget and Lease
This stage decides most of the cost and most of the risk.
- Appoint an internal move lead with authority to make decisions.
- Review your current lease: end date, notice period, renewal options and restoration obligations.
- Define requirements: headcount today and in three years, hybrid work patterns, meeting rooms, storage and growth.
- Set an overall budget that includes rent, construction, furniture, IT, moving costs and a contingency.
- Tour shortlisted spaces with a contractor to check HVAC, electrical capacity, washrooms and accessibility.
- Negotiate the tenant improvement allowance, landlord’s work and a rent-free fixturing period.
Our guide to leasehold improvements and tenant improvement allowances explains what to ask for. To set a realistic budget, see how much it costs to renovate an office building.
5 Months Out: Space Planning and Design
With the lease signed or close to final, turn the requirements into a layout.
- Prepare a test fit showing workstations, offices, meeting rooms, reception, kitchen and storage.
- Decide which existing walls, ceilings and finishes can stay. Reuse saves time and money.
- Plan power and data locations for every desk, screen, printer and meeting room.
- Confirm accessibility requirements for entrances, washrooms and paths of travel.
- Choose finishes, lighting and furniture, noting any items with long lead times.
For layout and finish inspiration, browse our office design ideas. If the space needs barrier-free changes, review the AODA and barrier-free requirements for commercial renovations before the drawings are final.
4 Months Out: Permits, Pricing and Contractor
- Finalize permit drawings and submit the building permit application where one is required.
- Submit drawings to the landlord for approval, along with insurance certificates.
- Collect pricing on the same scope from each contractor, and confirm the construction schedule.
- Order long-lead items such as glass partitions, custom millwork, light fixtures and furniture.
- Book building elevators and loading docks for construction deliveries if required.
Choosing the builder is one of the biggest decisions in the move. Our checklist for choosing an office fit-out contractor covers what to verify, and working with an experienced office renovation contractor in Toronto keeps design, permits and construction on one schedule.
3 to 2 Months Out: Construction and IT
Construction usually runs during this window. Keep weekly site meetings and track decisions in writing.
- Confirm the construction schedule and key milestones: demolition, framing, rough-ins, inspections, finishes.
- Order internet service early. Installation lead times can be longer than expected.
- Coordinate data cabling, Wi-Fi, security, access control and AV with the construction schedule.
- Plan the IT cutover: phones, servers, printers and how long systems will be offline.
- Give notice to your current landlord as required and schedule any restoration work.
1 Month Out: Moving Logistics
- Book a commercial moving company and confirm elevator and loading dock times at both buildings.
- Update your address with clients, suppliers, banks, insurers, Google Business Profile and your website.
- Order new signage, business cards and printed materials.
- Give employees a seating plan, a packing guide and a move-day schedule.
- Arrange secure disposal of old furniture, equipment and confidential documents.
Moving Week and Move-In Day
- Confirm the occupancy approval or final inspection where required before people move in.
- Walk the new space with your contractor and note any deficiencies.
- Label furniture and boxes by room and desk number.
- Test internet, phones, printers, security and access cards before staff arrive.
- Have the move lead and IT support on site for the first business day.
After the Move: Deficiencies and Closeout
- Track deficiencies to completion and collect warranties, manuals and as-built information.
- Submit invoices and documents needed to claim the tenant improvement allowance.
- Complete restoration of the old space and get the deposit back.
- Ask employees for feedback after a few weeks and adjust what is not working.
Make the Move a Project, Not a Scramble
A good office move is a construction schedule with a moving day at the end of it. Start early, involve your builder before you sign, and protect the dates that drive everything else: permits, long-lead materials and IT.
Octopus Build Group works as commercial renovation contractors in Toronto and the GTA, including office fit-outs such as the Exit Realty Legacy office. You can learn more about Octopus Build Group and our founder, David Yosef, or request a free estimate for your new space.
Frequently Asked Questions
How far in advance should I plan an office move?
At least six months for a small or mid-sized office, and longer if the new space needs major construction or a change of use.
What is the biggest cause of office move delays?
Late decisions. Signing a lease before the fit-out is planned, waiting on permits, and late orders for long-lead materials or internet service are the most common causes.
Should I hire a contractor before signing the new lease?
Yes. A site walk and preliminary budget show whether the tenant improvement allowance and schedule are realistic, and which base building issues to negotiate with the landlord.
Do I need a permit for an office fit-out?
Many fit-outs that change walls, plumbing, HVAC, electrical or exits require a building permit. Your designer or contractor can confirm based on the scope.
What should I do with my old office?
Check the lease for restoration obligations, schedule any required work, and walk the space with the landlord before handing back the keys.